Rudra Group of ConstructionsINFRANITH0%
InfranithINFRANITHRudra Group of Constructions
All Projects
Bridge & Road InfrastructureCompleted

Taramandal Bridge, Gorakhpur

A public bridge in Gorakhpur, modelled and visualized from every angle.

Taramandal Bridge, Gorakhpur — 3D render at sunset
Client
UP Govt. (executed by Mittal Brothers Engineers & Contractors)
Location
Taramandal, Gorakhpur, Uttar Pradesh
Completed
30 Oct 2025
Services
3D Modelling
Category
Commercial
Status
Completed
Overview

The Taramandal bridge in Gorakhpur is a public infrastructure project of the Government of Uttar Pradesh, executed by Mittal Brothers Engineers & Contractors. Infranith produced the 3D model of the structure and its setting, so the geometry of the deck, the abutments and the waterfront could be reviewed visually by everyone involved.

From that single model we rendered the bridge from water level, from the carriageway and from above — in daylight and at sunset. The site photographs in the gallery show the bridge as built, with its footpath, railings, street lighting and marked carriageway.

Scope of work
  • 3D modelling of the bridge deck, abutments, railings and surroundings
  • Photorealistic renders from water-level, deck-level and aerial viewpoints
  • Daylight and sunset visualizations for review and presentation
  • Presentation deck summarising the model and views
Highlights
  • Government infrastructure project in Gorakhpur, Uttar Pradesh
  • Seven design renders from water level, deck level and above
  • As-built site photographs shown alongside the design renders
Gallery

Project Images

13 images
Downloads

Documents & Drawings

Location

P9HQ+VJ8, Rail Vihar Colony Phase 3rd, Taramandal, Gorakhpur, Uttar Pradesh 273017

View on Google Maps

Planning something similar?

Tell us about your site and requirements — we'll sketch a rough plan before any commitment.

Start a project